| |
1. |
|
|
| |
2. |
Design and development of Vacuum to 10bar heat treatment furnace with SCADA facility |
|
| |
3. |
Upgrading of PLC for Kapar Power Plant coal handling system |
|
| |
4. |
Upgrading of control system for semiconductor manufacture temperature chamber |
|
| |
5. |
Design and implementation of GSM based alert system for Mini-Hydro Power Plant |
|
| |
6. |
Upgrade of Vacuum furnace for heat treatment process |
|
| |
7. |
Design and development of the Vacuum Control System for Sun Power manufacture plant, Malaka. |
|
| |
8. |
Supply and Installed Production Display System at Proton, SijanKang, Klang Pre-Delivery Inspection Centre |
|
| |
9 |
Supply and Installed Production Display System at Proton Tg Malim Pre-Delivery Inspection Centre |
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| |
|
|
|